Aim of the project is to develop and design successful and efficient road network that would connect new road network with the existing one. Scope of work also includes new storm water system design, electrical network, sewage network, street lighting, sweetwater supply network, telecommunication network, gas distribution network as well as other utilities.
Total length of new road network– 6.95km
-Contract Duration 02.2017 – to present