The aim of the project was to develop tram track reconstruction project, including tram destination loop, as well as tram stop platforms, to adapt 6th rout tram for low floor tram exploitation requirements.
Total length of 5.4km, Construction was finished in 2014.
-Contract Duration 12.2006 – 03.2009