RTI
  • Home
  • Services
  • Products
  • Road Maintenance
  • Partners
  • Projects
  • About
  • Contact
  • English
  • Latviešu valoda

Development of perspective scheme “Northern crossing over Daugava detailed planning transport connection with motor road A2”

Aim of project was to evaluate and compare all developed motorway location versions, developing feasibility studies and environment impact assessment for every version, as well as accept general version according to environment impact assessment closing report. For general version – to develop detailed design for further construction project development. Project includes also motorway construction division into realization estates. Division criteria – rational introduction of gradually constructed motorway section (junction) in Riga traffic system. Total length – 9.5km, 5 Grade Seperated Interchanges, Bridges over the rivers 250m and 105m.

-Contract Duration 03.2009 – 09.2012

Client:
-
Date:
-
Location:
-
Category:
Road Design / Traffic Modelling
Share on:
Facebook Twitter Google Plus
Development of perspective scheme “Northern crossing overDaugava detailed planning transport connection with motorroad A2”
Development of perspective scheme “Northern crossing overDaugava detailed planning transport connection with motorroad A2”
Prev Project
Next Project

© Copyright 2017 RTI Design. All Rights Reserved.

  • Home
  • Services
  • Products
  • Road Maintenance
  • Partners
  • Projects
  • About
  • Contact
  • English
  • Latviešu valoda