Design of a new flyover over the existing main arterial railway track and upgrading of the existing at grade signalized junction at Smilsu and Kaunas street to grade seperated junction.
Total length of new grade seperated junction is 2.10km
Total length of the new flyover over the railway track is 340m.
Project scope of work also includes all affected existing utility relocatio nand protection.
-Contract Duration 10.2014 – 05.2016